HEN Technologies · Manufacturing systems

Manufacturing Build Dashboard

Production planning and shop-floor tracking for a company running no ERP, PLM or MES.

84SKUs tracked
12Product families
97Finished-goods lines
0ERP/PLM/MES

Build board

Each order broken into its real operations — subassemblies, final assembly, flow test, static pressure — with independent status, technicians and timeline. Answers what is happening right now without a standup.

Operation-level tracking with multi-technician assignment.
Operation-level tracking with multi-technician assignment.

Forecast vs. reality

Every finished good across 12 families, on-hand set against the quarter’s forecast, with shortfall computed per line. Turns a sales forecast into a build plan.

97 lines, filterable by program and revision. Quantities blurred.
97 lines, filterable by program and revision. Quantities blurred.

Live BOMs from MRP

Multi-level BOMs pulled from MRPeasy rather than re-keyed. Enter a build quantity and parts below MRP’s own reorder point are flagged — zero on hand always critical.

BOM explosion synced from MRP. Part numbers masked, stock blurred.
BOM explosion synced from MRP. Part numbers masked, stock blurred.

Shared-part planning

The piece spreadsheets get wrong. Add several SKUs with target quantities and shared parts have their demand combined against the same stock — the difference between a plan that builds and one that stalls halfway.

Build metrics

Blended yield, average build time, and a failure Pareto to aim corrective action at the right defect.

Built but not yet wired to live MRP history — shown with preview data, as flagged in the UI.
Built but not yet wired to live MRP history — shown with preview data, as flagged in the UI.
Screenshots are from the live tool. Technician names, part numbers, stock and forecast figures are masked or blurred; workflow and layout are untouched.